Installation Instructions
12
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
2000 Series Pedestal Lighthouse
Instructions for:
  Utility Channel (UT2048),
  (UTC2048), Pedestal Lighthouse
 (LH2000)
Tools Needed
9/16” (16 mm) Socket wrench
3/8” (9.5 mm) Drill Bit and Drill
Step 1
Remove lid of Utility Channel and
turn upside down.
Step 2
(a)Center metal bracket on Utility 
Channel Lid. (b)Mark and drill four 
corner holes all the thru the lid. 
(c)Dotted line shows area that 
could be cut to run utility lines to 
the power pedestal. Only cut a 
hole as large as needed.
Step 3
Secure Power Pedestal with cariage 
bolts, up thru Utlity Channel Lid. 
Tighten all bolts in the dock using
25 lbs/ft (3.46 kg/m) of torque. 
Step 4
Set Lid and Pedestal on top on the 
channel and Tighten all bolts in the 
dock using 25 lbs/ft (3.46 kg/m) of 
torque.
Before you begin: Determine the
layout and location of your utility 
channel and Pedestal Lighthouse. 
Note: Power Pedestal needs to 
mounted between lid bolt points 
and not overlapping Utility 
Channel sections. NOTE: Power 
Pedestal hook up instructions 
included with Pedestal Lighthouse.
 2
 3
 1
FOR SAFE INSTALLATION AND OPERATION - All utilities conduit 
needs to meet all state and local utilities construction codes
 4
(c)
(c)
(b)
(a)