Installation Instructions
14
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
Gangway
Step 3
With the notched end forward, 
position aluminum cross members 
on the back side of the Decking 
Panel inside the Gangway Frame. 
Step 4
Slide Decking Panel forward into 
place. Repeat with second Decking 
Panel for gangway GW1028.
Step 5
Repeat Step 3 and Step 4 with second 
Decking Panel for gangway GW1028. 
Make sure the tip of the Second Decking 
Panel is under the lip of the
First Decking Panel. 
Note: Check all bolts every three months or as needed to
  insure all connector hardware is securely fastened.
 4
Recommendation: To add more buoyancy and stability
with Gangway, use Extra Flotation under Float Section. 
Assembled GW1024
4’ x 4’ Gangway
(1.2 m x 1.2 m)
Place inside
Notch
Decking Panel
Gangway Frame
 3
Float Section
Float Section
Slide forward
Decking Panel
Gangway Frame
First Decking Panel
Gangway Frame
 5
Float Section
Second Decking Panel
Notch
Assembled GW1028
4’ x 8’ Gangway
(1.2 m x 2.4 m)










