Installation Instructions
5
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
2000 Series High Profile (HP) Dock
Instructions for
Float Section (FS2096), (FS2024)
Float Connector (FC2020), (FC2020M)
2 or more people are needed for
installation
Tools Needed
9/16” (16 mm) Socket wrench
Long rope for holding docks to
shore.
Step 1
Install Float Connectors into all
Float Section sockets where other
Float Sections will be attached.
Secure Float Connectors into sockets
with bolts, washers, and bushings
provided (hand tighten only).
Place first Float Section into the
water and temporarily attach to
shore with rope.
Step 2
Position yourself carefully on the floating
Float Section(s). Continue adding Float
Sections by placing
them over the Float Connectors,
shift your body weight to the new
Float Section and hook into place.
Secure with bolts, washers, and
bushings.
Step 3
Tighten all bolts in the dock using
25 lbs/ft (3.46 kg/m) of torque. Anchor
as desired. NOTE: DO NOT SUBMERGE...
a minimum of 3” (7.62 cm) must show above
the water surface for venting purposes.
Before you begin: Determine the
layout and location of your dock.
Align Float Section with Float Connectors
and position body weight here.
2
1
Note: Check all bolts every three months or as needed to
insure all connector hardware is securely fastened.
Float Connector
Shore
Hardware Included
3/8” x 1-1/4” (10 mm x 35 mm)
Hex bolts
Diamond washers
Bushings