Installation Instructions
Basic Square Layouts
• Place a mark in the center of the oor at each end of the room.  
(AB) Then snap a chalk line between the marks.
• Find the center of the line and snap a second chalk line at a right 
angle (CD); use the 3’, 4’, 5’ method to form a right angle (Fig. 6).
• Make a dry layout in one quadrant along the center and perpendicular 
chalk lines. Remember to allow the desired grout line space between 
the tiles. A story pole (board marked with tile dimensions, including 
grout line width) can also be used in place of a dry layout. 
• Measure the distance between the last whole tile and the wall. If the 
distance is less than half a tile, snap a new chalk line one-half the 
dimension of a full tile away from the original chalk line (Fig. 7). 
This will provide a balanced layout with larger cut tile at the border.
• When installing DuraCeramic Dimensions in a 1/2 drop layout or a 
1/3 drop layout it will be necessary to snap additional chalklines for 
starting locations. First complete a basic square layout with center and 
perpendicular lines. Normally the tiles are laid with the long dimension 
parallel with the long dimension of the room. 
 1/2 Drop Layout
• Snap a second perpendicular chalkline 12" away from the rst  
perpendicular line (Fig. 8). Complete a dry layout in the rst 2 rows 
starting from the perpendicular chalklines. If the border tile 
in either row is less than 6", adjust the perpendicular lines 6" in 
either direction. 
1/3 Drop Layout 
• Snap two additional chalklines, one 8" and the other 16" away from 
the center perpendicular line (Fig. 9). Complete a dry layout in the rst  
3 rows starting from the center perpendicular chalkline. If the border 
tile in any of the 3 rows is less than 4", adjust all three perpendicular 
lines 4" in either direction. 
Note: Chalk lines can be easily removed or difcult to see after applying 
adhesive over some suboor surfaces like old ooring and concrete. T
o 
avoid losing the lines, mark the suboor with a pencil and a straightedge, 
directly over the chalk lines.
Adhesive Application
Congoleum DS100 DuraSet Adhesive and AD32 Adhesive (for Ovations) 
are pressure-sensitive adhesives that must be allowed to dry completely 
to a tack before setting tiles. 
•  Apply the adhesive with the trowel blade adaptor included with 
the adhesive. The recommended trowel notch size is 1/16" wide, 
1/32" deep, 1/32" apart. 
• Spread the adhesive over one-half of the suboor and a few inches 
beyond the center chalk line.
•  Allow the adhesive to dry completely to a tack before installing the tile. 
Normal dry to tack time is about 45 to 60 minutes; longer in cool or 
humid conditions. The adhesive will turn from light blue to clear when 
tacky dry and will not transfer to the nger when rmly touched. Do 
not use fans to accelerate adhesive drying time. Fan drying can cause 
the top surface of the adhesive to dry prematurely, trapping residual 
moisture in and preventing the adhesive from fully curing. 
• Tile must be installed within 12 hours after adhesive turns clear.
Fig. 7 - Adjust layout at center lines 
for larger border tiles.
  DuraCeramic  DuraCeramic  Ovations
  Origins  Dimensions (14" x 14")
  (15 5/8" x 15 5/8") (12" x 24")
Square or Straight  Yes  Yes  Yes
Diagonal  Yes  No Yes
½ Drop  Yes  Yes  Yes
1/3 Drop  No  Yes  No
Paver  No  Ungrouted only  No
Herringbone  No  Ungrouted only  No
9
Fig. 6 - Square layout.
A B
C
Figure 8 - 1/2 Drop Layout.
Figure 9 - 1/3 Drop Layout.
Center Line
4'
5'
3'
90°
59










