Specifications

Table Of Contents
51
- as soon as the photovoltaic modules produce sufficient power, the LED
lights up orange and the screen starts displaying the startup procedure
- the orange light of the LED indicates that the automatic startup proce-
dure of the Conergy WR unit will begin shortly
- after the Conergy WR unit has started automatically, the LED light turns
green
- the LED light continues green as long as power supply is fed into the
mains, it confirms that the operation continues to function without fault.
In case the initial operation of your Conergy WR unit does not proceed as
shown above and the Conergy WR unit does not start feeding power
supply into the mains network, you should consult the chapter „Error
Diagnosis and Repair“
Start up Operation
Configuring your Inverter
Your Conergy WR unit has been pre-configured in the factory and is
ready for operation.
After connecting the Conergy WR unit to the solar modules (DC) and to
the public utility mains (AC), all you have to do is close the AC and DC
isolating switch.
Factory pre-
set configura-
tion
LED