Owner's manual

6. Add lubricant to Conduit before Carrier: 1/2 quart/6000 feet (.5 liter/2 km)
(Figure 52).
7. Feed Cable Assembly through the counter rollers by lifting the Counter Roller
Bracket. Lock the Rear Cable Guide Roller into place, and feed the cable
through the Tractor Feed. (Figure 53).
8. Push Cable Assembly, including entire
Cable Grip, into Conduit.
9. Add lubricant to Conduit behind Cable
Assembly: 1/2 quart/3000 feet
(.5 liter/1 km) (Figure 54).
26
Figure 52. Add Lubricant before
Cable Assembly
Figure 53. Feed Cable Assembly
Through Blower
Figure 54. Add Lubricant Behind
Cable Assembly
Figure 50. Open Rollers
Figure 51. Tilt Blower