Owner's manual

7. Close the Air Block Cover. Tighten spanner nuts securely, but do not over
tighten (Figure 41). Use cross tightening procedure with the spanner wrench to
secure completely.
8. Prove conduit integrity and spread lubricant through Conduit.
a. Re-connect the air hose to the fiber blower and attach all safety clips.
b. Turn the Air Control Valve handle to the 12 o’clock position and turn on the
air from the compressor (Figure 42).
c. Slowly open Air Control Valve by turning to the 3 o’clock position.
d. Blow Foam Carrier through conduit to spread lubricant and check for
blockage. Follow all safety precautions.
e. After the Foam Carrier exits, close Air Control Valve.
NOTE: Foam Carrier must exit in a reasonable time, allow for approximately
10 seconds per 1,000 feet (300 m) or conduit may be contaminated or blocked.
23
Figure 39. Insert Foam Carrier
Figure 40. Insert Seal Disk
Figure 41. Tighten Air Block
Cover
Figure 42. Close Air Control Valve