Owner's manual
22
Prepare Conduit for Cable
1. Remove Conduit Pulling Eye and Pulling Grip from receiving end of Conduit.
After removing pulling eye, re-install pulling grip in order to catch Foam Carrier
during conduit lubrication (Figure 35).
2. Open the Air Block Cover (Figure 36).
3. Tilt Blower forward (Figure 37).
4. Pour recommended (silicon-based) lubricant into Conduit opening before
Foam Carrier: 1 quart/6000 feet (1 liter/2 km) (Figure 38)
(See Appendix T for lubricant ordering information).
5. Insert Foam Carrier (selected according to conduit size) into Conduit
(Figure 39) (See Table 2 on page 18).
6. Insert Seal Disk in venturi slot if not already in place. (Figure 40).
Figure 35. Install Pulling Grip on
Conduit
Figure 36. Open Air Block Cover
Figure 37. Loosen Handle to Tilt
Blower
Figure 38. Pour Lube into Conduit
8.