Operation Manual
13Operation
4 Operation
The Condair RS steam humidier may be commissioned and operated only by persons familiar with the
Condair RS steam humidier and adequately qualied. It is the owner’s responsibility to verify proper
qualication of the personnel.
4.1 First-time commissioning
The rst-time commissioning must always be done by a service technician of your Condair representative
or a well trained and authorised person of the customer. Therefore the current manual does not provide
detailed information on this procedure.
The following steps are carried out upon rst-time commissioning in the specied order:
• Inspecting the steam humidier for correct installation.
• Inspecting the electrical installation
• Inspecting the water installation
• Inspecting the steam installation
• Flushing the water supply line.
• Conguring the control or the Condair RS, respectively.
• Carrying out test runs including checking of the control and monitoring devices.
• Filling in the commissioning protocol.
4.2 Display and operating elements
Fig. 4: Display and operating elements
DANGER!
Risk of electric shock!
After switching off the unit switch, there is still live voltage inside the control compartment of the Cond-
air RS.Therefore,beforeopeningtheunitthesteamhumidiermustbealwaysseparatedfrom
the mains supplies (heating and control voltage) via the electrical isolators.
1 External electrical isolators for heating and control volt-
age supply (not includ ed in the delivery, must be install-
ed in the mains supply lines)
2 Touchscreen
3 Status LED
– green: Condair RS is humidifying
– green pulsing: Condair RS is in standby operation
– orange: Warning present or maintenance due
– red: Fault present
4 Unit switch
Humidier
Humidier










