VACUUM LOADERS GSL Series Models: GSL-19 & GSL-19-MM (Patent Pending) GSL-19 Tilted GSL-19 GSL-19-MM Machine Mount Instruction Manual GSL 9-12-12 IM Doc.
NOTES: Please record the following information, which is specific to this piece of equipment, in the space provided. Our Parts/Service Department will need these numbers to properly respond to any of your requests. Instruction Manual: GSL 9-12-12 IM Model #:___________________________ Serial #____________________________ DISCLAIMER: NOVATEC, Inc. shall not be liable for errors contained in this Instruction Manual nor for misinterpretation of information contained herein.
Table of Contents 1 SPECIFICATIONS ................................................................................................................. 4 1.1 Options: ............................................................................................................................... 4 2 PRINCIPLE OF OPERATION ................................................................................................ 4 3 UNPACKING AND INSPECTION .............................................................
1 SPECIFICATIONS NOVATEC GSL Series vacuum loaders are completely automatic self-cleaning vacuum loaders designed to convey virgin pellets and regrind materials from storage containers to drying hoppers or directly to process machines. Each unit is shipped complete with all controls for immediate operation, and include a hardware package.
3 UNPACKING AND INSPECTION NOVATEC Vacuum loaders are shipped complete, with all controls for automatic operation. The only utilities required are a 115 VAC power supply and clean, dry compressed air at approximately 80 PSI. After receipt of the unit, completely inspect it for damage. Although the units are packaged securely, vibration and mishandling during transit can cause damage. Please report any damage to your carrier promptly.
4 INSTALLATION 4.1 GSL Control Pendant (see page 6) 1 Locate HINGE away from operator for easy cleaning Material Line Connection 1 3 Connect Fitting on Solenoid Valve to Compressed Air (Pilot for Blowback) 2 115 VAC Power Cord GSL Mounting Plate (see page 3) Domed filter stays in place when tilted. 1 2 Feed Tube Inserted into material Install flexible hose, secured with hose clamps at both ends, from feed tube to material inlet tube of loader.
GSL Mounting Flange Patterns – NOVATEC Compatible GSL – Mounting to Other Patterns Compatible with NOVATEC / Maguire GVL-10 Compatible with Conair AL2, AL5, DB8 and DB12 mounting patterns New or existing NOVATEC hoppers will allow mounting the GSL directly. Hoppers with large openings for 5” dump throat models will use the VL-12 to VL-38 adaptor, included with the GSL unit.
4.2 GSL MACHINE MOUNT MODELS The upper part of the machine mount model still tilts for ease of access to clean/replace filters. Upper and lower parts of machine mount model are connected together with a plate that slides into place. 8 lb. (3.6 kg) JIT Glass Hopper with heightadjustable photo eye demand switch A detent pin locks the plate in place.
5 OPERATION OVERVIEW 3 Vacuum motor should fill loader until 5 seconds before pellets stop moving through the convey hose and no more. 2 Press button to turn on loader and adjust load time with + buttons.
6 ADJUSTING THE LOADER CONTROL CONTROL BOX Motor Plug Connection Solenoid Valve (Air) Connection Power Connection Demand Switch Connection Pendant Cable Connector POWER* Press for On or Off Display shows “ON” Force Alarm Reset GSL 9-12-12 IM * The “Power” button enables or disables loading. Power is only disconnected by unplugging the power cord.
SELECT FUNCTION BUTTON ● Button selects functions for viewing and/or changing. ● Selected function lights up, below. ● Silences Alarm (does not reset alarm) STANDARD FUNCTIONS ● MOTOR ON: Seconds per load ● BLOWBACK FILTER CLEAN: “XY” X=loads/clean; Y=air charge (Y*0.4s) ● ALARM: ‘No Load’ cycles to create alarm “0” = Alarm disabled. See Alarm Function description (p.
7 INITIAL STARTUP NO LOAD ALARM FUNCTION ENABLING: When the GSL is turned ON, the control operates to fill the ‘hopper’ being loaded. To avoid nuisance alarms, the NO LOAD ALARM is not enabled until the demand has been satisfied as follows: The 'demand' input remains off for the ‘Demand Timer’ (Dump Time plus ~5 seconds). The control assumes this timing sequence indicates the ‘hopper’ has completed an initial fill process.
8 ELECTRICAL CONNECTIONS FOR LOADER OPTIONS -Proportioning Valve -Purge Valve -Output to Auxiliary Alarm Device 1. Remove the loader control enclosure, and carefully tip the enclosure out without straining wires connected to the control. 2. Locate the correct terminals for the device you are connecting, as shown in the diagrams that follow, and connect the wires carefully. Use care as some terminals accommodate multiple wires. 3. Route the cable out of the control box, through one of the slots in the side.
GSL 9-12-12 IM Page 14
GSL 9-12-12 IM Page 15
9 TROUBLESHOOTING Most loader problems are a result of a dirty filter, air leaks or improper adjustments. These items should be checked before assuming equipment failure. Problem Motor will not run Inadequate or no vacuum Inadequate or no material flow Motor runs but proportioning solenoid not operating CHECK A. Power Supply Investigate A, B, C, H, and L D, E, F, G, J D, E, F, and G, I, K L CONDITIONS No voltage or voltage incorrect voltage at outlet B. Stop/Start Switch No voltage through switch C.
10 WARRANTY – NOVATEC, INC. - Effective Date 6-12-12 NOVATEC, INC. offers COMPREHENSIVE PRODUCT WARRANTIES on all of our plastics auxiliary equipment. We warrant each NOVATEC manufactured product to be free from defects in materials and workmanship, under normal use and service for the periods listed under “Warranty Periods”.