Specifications

Appendix l AA-7
Mounting Method 2
1 Reference the drawings at the end of this Appendix and select the drawing
that reflects your installation. Drill the appropriate hole in the top of the hopper.
2 Drill and tap four 10-32 UNF
holes to match the hole pattern
in the coupling.
3 Secure the gasket and coupling to the hopper with the four 10-32 screws.
Remove any excess gasket with a knife.
4 Insert the probe through the coupling in the
top of the hopper.
5 Screw the fitting into the coupling. Tighten
with a wrench.
6 Make sure the probe is the correct size. The
probe should extend from just above the top of
the hopper into the hopper, with the tip approx-
imately in-line with the bottom
edge of the diffuser cone.
7 Push the compression sleeve into
the fitting.
8 Tighten the nut over the sleeve.
The compression sleeve will crimp the tube to
hold the probe in place. Be sure to position the
connector in such a way as to avoid interfer-
ence of the cable with the loader, etc. Use a
wrench to tighten the nut so that it covers the
threads.
Four 10-32 UNF
holes evenly spaced
around a 1
1
/
2
in.
(38.1 mm) circle
1
/
2
in. (12.7 mm)
diameter center hole
3
Sleeve
5
Connector
Coupling
Gasket
Nut
Fitting
7
8
NOTE: The mounting adapter
kit will only be included if the
DM-II was ordered as a retro-
fit kit. Remove the mounting
adapter plates from the probe
assembly, you will not need
them. You will need the gasket.
6
TIP: Stretch cloth or plastic
across the inside of the hopper to
catch metal shavings from the
hole you will drill in the top of the
hopper.
Tools for Installation:
Drill and 10-32 tap
Knife
Flathead screwdriver
3/4-in. wrench
7/8-in. wrench
NOTE: If the angled probe is
used, the bend in the probe must
be oriented to the left of the
probe connector. The male con-
nector must face directly away
from the center of the hopper.