Specifications
Mounting Method 1
1 Insert the probe through the coupling in the top of the drying hopper.
2 Screw the fitting into the coupling. Tighten with
a wrench.
3 Make sure the probe is the correct size. The
probe should extend from just above the top of the
hopper into the hopper, with the tip approximately
in-line with the bottom edge of the diffuser cone.
4 Push the compression sleeve into the fitting.
5 Tighten the nut over the sleeve. The compression
sleeve will crimp the tube to hold the probe in
place. Be sure to position the connector in such a
way as to avoid interference of the cable with the
loader, etc. Use a wrench to tighten the nut so that
it covers the threads.
AA-6 l Appendix
2
3
4
Sleeve
5
Connector
Coupling
Tools for
Installation:
❒ 3/4-in. wrench
❒ 7/8-in. wrench
NOTE:The mounting
adapter kit will only be
included if the DM-II was
ordered as a retrofit kit.
✐
NOTE: If the angled probe is
used, the bend in the probe
must be oriented to the left
of the probe connector. The
male connector must face
directly away from the center
of the hopper.
✐










