Specifications
Maintenance Checklist
The DM-II requires little maintenance. We recommend the following mainte-
nance schedule and tasks.
• Whenever you change hoppers
❒❒
Verify or change setpoint entries on the control.
Verify that the temperature settings are correct for the application and
material in this hopper.
• Whenever you change materials
❒❒
Change the setpoint entries on the control.
Verify that the temperature settings are correct for the new material.
❒❒
Inspect the probe and mounting assembly.
If the probe is damaged, replace it. If vibration has loosened the probe
mounting hardware, tighten it.
• Monthly, or as often as needed
❒❒
Inspect cables and cords for damage or wear.
Replace any cable or power cord that is worn.
❒❒
Inspect cable connections.
Check for damage or loose connections. Tighten the connections or
replace the damaged connectors.
AA-30 l Appendix










