Specifications

51
BeforetheCondairGSisoperatedforthersttime,theresponsiblepersonnelmustinspect all
installations for correct executionandcheckthattheunitiscorrectlycongured(seecheck
list in chapter 6).Alldecienciesmustbecorrectedbyspecialistactionbeforecommissioningtakes
place.
Thehumidierisoperatedasfollows:
1. Examinethehumidierandallinstallationsforpossibledamage.
CAUTION!
Damagedunitsandunitswithdamagedinstallationsmustnotbeoperated!
2. Checkthecleanlinessoftheoutercabinet:
Thepanelsmaybecleanedwithadampclothandwarmsoapywater.
CAUTION!
Makesurenowaterisdrippingintothecabinetthroughtheventilationopeningsintheunit
housing.
3. Fillthewatertank:
• Closetheshut-offvalveinthegassupplyline.
• Opentheshut-offvalveinthewatersupplypipe.
• Sethumiditycontrollertomaximumhumiditydemand.
• Switch-ontheserviceswitchintheelectricalsupplycircuit.
• Switch-onthehumidierattheunitswitch.
• Thellingvalveopensandthewatertanklls(llingtime:approx.30minutesforthelargest
model,forsmallerunitsthellingtimeisshorter).Attheendofthellingcyclethecontrolunit
checksthefunctionofthewaterlevelunit.Ifthecontrolunithasveriedtheproperfunction
ofthewaterlevelunittheignitionsequencestarts.Afterthreeattemptsatignitiontheauto
ignitionswitchesoff.TheredLEDlightsandacorrespondingerrormessageisshowninthe
display.NowswitchthehumidierOff.
4. Checkignition:
Theregulatorisstillsettomaximumhumiditydemandandtheshut-offvalveinthegaslineis
closed.
• Switch-Onthehumidierattheunitswitch.
Thecombustionairblower(s)start(s).Note:Onmulti-blowerunits,waituntilallblowershave
started.
Then, 15 seconds later (pre-purging time) the igniter is activated and the gas pressure regulat-
ing valve opens. After 7 seconds the gas pressure regulating valve closes and the igniter is
de-energized (due to missing ignition).
Note: On multi-burner units, this process is successively completed for all burners.
Afterthreeignitionattemptsperburner(completewithpre-purging),thehumidiergoesinto
safetylockout.
• Opentheshut-offvalveinthegassupplypipe.
Nogasshouldowtothemainburner.Endofthetest.
• Switch-offthehumidierattheunitswitch.Note:Toresetthesafetyswitch-off,switch-offthe
humidierforatleastvesecondsandthenswitchitonagain.
• Adjustthehumiditycontrolleragaintothesethumidityvalue.
7.3 Commissioning