Specifications

49
7 Operation
Qualicationofpersonnel
TheCondairGSmustonlybecommissionedandoperatedbypersonswhoarefamiliarwithequip-
mentandadequatelyqualiedtoundertakethiswork.Monitoringsuchqualicationisamatterfor
the customer.
InitialcommissioningmustonlybeundertakenbytheCondairservicetechnicianorbythecustomer‘s
ownspeciallytrainedpersonnel.
Safety
Donotstoreorusegasolineorotherammablevaporsandliquidsinthevicinityofthisoranyother
appliance.
Should overheating occur, or the gas fail to shut off, shut off the manual gas valve to the appliance
before shutting off the electrical supply.
Donotoperatethisapplianceifanyparthasbeenexposedtoexcesshumidity.Immediatelycalla
qualiedservicetechniciantoinspecttheapplianceandtoreplaceanypartofthecontrolsystem
andanygascontrolwhichhasbeenunderwater.
Anopenunitmustnotbeoperated.BeforeputtingtheCondairGShumidierintooperationmake
surealldoorsareclosedandlockedwiththescrew.
ForsafeoperationoftheCondairGShumidier,makesuretheambientconditionsmeettherespec-
tivespecicationsdenedinthisdocumentation.
TopreventexcesshumidicationtheoperationoftheCondairGSmustbemonitoredbyahighlimit
on/off humidistat (see chapter 5).
7.1 Importantnotesonoperation