Specifications
31
5.4 Water installation
5.4.1 Performingthewaterinstallation
Overview water installation
1 FillingwaterconnectionBSP3/4"(outsidethread)
2 Filter valve (accessory “Z261”)
3 Fillingwatersupplyline(min.innerØ:12mm)
4 Manometer (installation recommended, building side)
5 Pressurereducingvalve(compulsoryforwaterpressures>8bar,buildingside)
6 Water drain connection 3/4" (Ø19 mm)
7 Drainline,buildingside(min.innerØ:45mm,min.50cmdirectedverticallydownwards)
8 Funnel (building side, min. height 15 cm)
9 Siphon(min.innerØ:>45mm,buildingside)
10 AuxiliarywaterdrainconnectionNPT 1/2" (inside thread)
11 Shut-off valve (installation recommended, building side)
9
6
7
8
10
11
1
2
3
4 5
min. 50 cm
min. 15 cm