Alarm cycles [number]
Number of idle fill cycles before fill alarm will appear. The number of alarm
cycles needs to be more than the number of filling cycles.
Example:
If the amount of alarm cycles is set to 10 times, the MV-loader will try with 10
extra filling cycles to get material conveyed to the TrueFeed. If still no
material is conveyed after these 10 extra cycles an alarm will be activated.
4.2 Adjusting compressed air flow
The compressed air flow can be regulated with the provided pressure regulator. The air flow will
determine how much material will be transferred and how fast the TrueFeed will be filled with
material, with each loading sequence.
Conair recommends adjusting the air setting to its lowest possible level in order to conserve
compressed air energy. Parameters such as distance, material line bends, the flow characteristics of
the material and vertical rises in the flex hose all play a part in finding the proper setting. Trial and
error settings over several loading sequences will work the best to determine the correct air level. Too
low of a setting may not move material effectively enough to satisfy demands cycle after cycle. Too
much air will waste energy and cause the filter to prematurely blind in an attempt to evacuate excess
air.
5. Maintenance
5.1 Preventative maintenance schedule
• Daily
Clean the conveying filter.
If you are running a dusty material or regrind you may need to check and clean the filter more often.
The filter should be cleaned whenever you change materials.