Technical information
PLC CONTROL
CHECKING FOR
LEAKS
Portable Chillers UGH024/1103
3-14 INSTALLATION
STATUS SETUP RUN ALM
After checking pump rotation, continue with startup by check-
ing the chiller for leaks. Do this by turning on only the pump
from the control and letting the pump run while checking the
inside of the chiller.
Press the Next arrow on the control to move
to the Main screen.
The Main screen displays:
1
Press the Pump ON arrow.
With the pump running check inside the chiller for leaks.
If you find leaks:
Press the Stop Chiller button on the
control panel.
Disconnect the chiller from the main power
supply and repair any leaks. Dry any moisture inside the
chiller.
Reconnect the main power supply.
1
2
3
4
Manual Pump ON OFF
press arrow
Press the Scroll arrows to scroll to the Manual
Pump screen. The Manual Pump screen displays:
STATUS SETUP RUN ALM
3
Press the Run arrow on the screen.
2
press arrow