Technical information
MAKING
PROCESS
PLUMBING
C
ONNECTIONS
UGH024/1103 Portable Chillers
INSTALLATION
3-5
Warm fluid from process equipment enters the chiller at the
From Process valve and chilled fluid returns to the process
equipment through the To Process valve.
Remove the shipping plastic pipe plug from
the female connections on the back of the portable chiller.
Make sure the male pipe threads are clean
and new.
Wrap threads with Teflon or pipe dope.
Connect the From Process valve (Factory
Optional) on the back of the chiller to the From
Process tubing. Start by hand until the threads engage and
then tighten with a pipe wrench. Tighten only enough to
prevent leaks; do not over-tighten!
Connect the To Process valve (Factory
Optional) on the back of the chiller to the return
tubing. Start by hand until the threads engage and then
tighten with a pipe wrench. Tighten only enough to pre-
vent leaks; do not over-tighten!
For the Water-cooled Chillers connect the water source for
cooling to the Condenser Water inlet on the back of the
chiller. Connect the Condenser Water outlet for returning
water.
1
2
3
4
5
For overhead piping installations, see Overhead Plumbing
Details, in the Appendix.
From
Process
To Process
Condenser
Water inlet
(water-cooled only)
Condenser
Water outlet
(water-cooled only)
Chillers to
XX tons
Chillers to
YY tons