User guide
TrueBlend™ Operation
Edition: February 2008 51
7.4.3 Restarting after EMERGENCY STOP
Î Switch the main power switch on.
Switching on within two minutes: the unit continues the interrupted process. This
function is used to keep downtime in the event of a short power interruption as short
as possible. The screen that was last open before switching off or power failure is
opened.
Switching on after more than two minutes: the internal functions are completely
reset after switching on. The start screen appears.
NOTE
If the metering cycle is interrupted, the material in the weigh bin must be re-
moved manually before restarting.
This will prevent an incorrect mix ratio.
Î Remove the weigh bin carefully to prevent damage to the load cell and
empty it (see also
7.12).
7.5 Turning off the power
7.5.1 Stopping the blender at the end of a cycle
Î From the “Blender Status” screen.
Î Press the
button.
The cycle is stopped. The button switches to
(yellow bar), after the
batch is finished to
(gray bar).
NOTE
If an alarm message is received when switching off and the unit does not
switch off, see chapter 8 Alarms messages and trouble-shooting
.