User guide

Installation l 3-11
3
Installation
Checking for Proper Air Flow (continued)
4 If air flow is incorrect disconnect power, follow proper lockout procedures and
swap any 2 of the 3 main power wires.
If the air flow is reversed, the process blower is turning in the wrong direc-
tion. Turn off and lock out the main power source. Open the electrical
enclosure and reverse any two leads connecting the main power supply to
the dryer.
WARNING: All wiring, disconnects, and fuses should be installed by quali-
fied electrical technicians in accordance with electrical codes in your
region. Always maintain a safe ground. Do not operate the equipment at
power levels other than what is specified on the the machine serial tag
and data plate.
WARNING: All wiring, disconnects, and fuses should be installed by
qualified electrical technicians in accordance with electrical codes in your
region. Always maintain a safe ground. Do not operate the equipment at
power levels other than what is specified on the the machine serial tag
and data plate.
LEADS