User guide

Installing the Overhead Process Air
Duct
(W3200 - 5000)
The Carousel Plus W Series Dryer’s overhead process air duct will be removed
when the dryer is shipped.
To install the overhead process air duct:
1 Remove the overhead process air duct that is attached to the dryer’s ship-
ping pallet. The piping will be shipped as one unit with included gaskets (2).
2 Locate the bolt patterns on the top of the dryer, over top of the overhead
process air duct inlet and outlet.
3 Position the overhead process air duct on top of the overhead process air
duct inlet and outlet making sure to place supplied gaskets between the
overhead process air duct and the inlet and outlet of the dryer, align all bolt
patterns.
4 Secure the piping with supplied hardware, using an appropriately sized
wrench.
Overhead Process Air
Duct
Gaskets (2)
Installation l 3-7
3
Installation