Technical information
You need to assemble the hopper and discharge before
mounting the hopper on the throat of the processing
machine.
Bolt the discharge to the hopper bottom.
Use the four 3/8-16 bolts with lock washers provided.
Place the slide gate on the throat of the
processing machine.
Position the slide gate so that its
bolt holes line up with the holes
that were drilled in the throat. If
hole patterns do not match, bolt a
mounting adapter between the throat and
slide gate.
Lift the hopper onto the throat.
Lift the hopper with a hoist, using the
lifting lugs provided. Make
sure you align the bolt holes in
the throat with the bolt holes
on the slide gate and discharge
assembly.
Bolt the hopper to the
throat of the machine.
Using four 3/8-16 (M 10) self-locking bolts, fasten the
support frame, discharge and slide gate to the throat. The
bolts must be long enough to reach at least 1/2 inch (1.25
cm) into the mounting adapter or processing machine
throat, after passing through the discharge and slide gate.
Lift the dryer onto the
floor stand, and bolt.
Lift using a hoist and strap.
Align the three bolt holes
on the bottom of the dryer with
the three bolts holes on the top of
the floor stand.
Bolt the dryer to the stand
using the three 1/4-20 bolts pro-
vided.
INSTALLATION 3-7
UGD001/1196 SC Carousel Dehumidifying Dryer
MOUNTING
THE
HOPPER
1
2
4
3
1
180
180
MOUNTING
THE
DRYER
2
3
2
4
1
NOTE:
You may
position the drain
port and slide gate
to face the direction
that best suits your
maintenance and
operation routines.
The slide gate also
can be mounted
between the hopper
and discharge
assembly. See “Slide
Gate Mounting
Options” in the
Appendix.










