Technical information

Remove the hopper base plate and bolts from the bag
attached to the mounting bracket/ discharge assembly.
Place the aluminum ring on the
mounting bracket / discharge assembly.
Bolt the base plate to
the hopper bottom.
Use the four 3/8-16 counter-
sunk bolts provided.
Place the slide gate on the
processing machine throat.
Position the slide gate so that its
bolt holes line up with the holes that
were drilled in the throat. If hole patterns
do not match, bolt a mounting adapter
between the throat and slide gate.
Bolt the support frame and dis-
charge to the throat.
Using four 3/8-16 (M 10) self-locking
bolts, fasten the support frame, discharge
and slide gate to the throat. The bolts
must be long enough to reach at
least 1/2 inch (1.25 cm) into the
mounting adapter or processing
machine throat after passing
through the discharge assembly,
support frame and slide gate.
Lift and bolt the hopper to the support frame
and discharge assembly.
Lift the hopper with a hoist, using the lug nuts provided.
Align the bolt holes and fasten, using the four 3/8-16
self-locking bolts provided.
Lift the dryer onto the support frame.
Lift using a hoist and strap.
Align the three bolt holes on
the bottom of the dryer with
the three bolt holes on the
top of the support frame.
Make sure the acorn nuts on
the bottom of the dryer fit in
the holes on the support
form. Fasten the dryer to the
frame with 1/4-20 bolts.
INSTALLATION 3-5
UGD001/1196 SC Carousel Dehumidifying Dryer
5
2
6
4
3
MOUNTING
DRYER AND
HOPPER ON A
PROCESSING
MACHINE
2
3
4
5
180
180
NOTE:
You may position
the drain port and slide
gate to face the direction
that best suits your mainte-
nance and operation rou-
tines. The slide gate also
can be mounted between
the hopper and discharge
assembly. See “Slide Gate
Mounting Options” in the
Appendix.
1