Technical information
The dryer and hopper mounts on a special bracket that bolts to
the throat of the processing machine, as pictured above.
3-4 INSTALLATION
SC Carousel Dehumidifying Dryer UGD001/1196
CAUTION:To prevent accident and injury,
lift the empty hopper onto the throat of the
processing machine using a hoist and the
lifting lugs provided. After the hopper is
mounted, then lift the dryer onto the support
frame using a hoist and strap.
180
180
WARNING:You are responsible for the
structural integrity of this installation.
We recommend that you:
● Use bolts no smaller than 3/8 inch (M 10)
when mounting the hopper/dryer combination
to the throat of a processing machine.
● Do not mount the hopper/dryer combination
on a plate that swings away or slides away
from the processing machine throat. Either
remove the swing or slide plate, or mount the
dryer on a floor stand.
!
Drying
hopper
Mounting
adapter
(optional)
Hopper
base plate
Support frame /
Discharge assembly
Hopper
slide gate
SC Dryer
Tools for installation:
❒
5/32” Allen wrench
❒
Phillips screwdriver
❒
Flathead screwdriver
❒
9/16” and 3/8” wrench
❒
Hoist and strap
NOTE: You must mount the
dryer on a floor stand, If
your processing machine
throat requires the small dis-
charge assembly or a
mounting plate with less
than a 3x3 inch (7.6x7.6
cm) bolt pattern and 1-inch
(2.54 cm) diameter opening.
MOUNTING
DRYER AND
HOPPER ON A
PROCESSING
MACHINE
!










