Specifications
C–1
Appendix C. CSAT-5060 100W or 125W
INSTALLATION
IMPORTANT
Upon completion of installation, refer to Chapter 8
for LNA installation.
C.1 Unpacking and Inspection
Inspect the shipping container for damage:
1. Retain shipping container and packing materials for possible re-shipment.
2. Check to determine that all parts, materials and documentation have been
shipped with the converter.
3. Inspect converter for possible damage, and then test for proper operation.
• Notify the Comtech EF Data Customer Service representative immediately
if the shipment is incomplete, or there is mechanical damage, or the
converter does not operate properly.
• Notify the carrier, and retain all shipping materials for inspection by the
carrier, if there is damage to the shipping container.
C.2 Man-Power
Comtech EF Data recommends that two technicians perform any of the following
installations.