User manual
Table of Contents
Computer Gateway User Manual iv 5/96
6 CG DATABASE CONTENT
6.1 Introduction
6.2 CG Memory Estimating
6.2.1 Memory Management Schematic
6.2.2 Database Memory Requirements
6.3 Viewing and Changing ACIDP and CRDP Points
6.3.1 Viewing and Changing Parameter Values From the Universal Station
6.3.2 Viewing and Changing Parameter Values From the Host Processor
6.4 ACIDP/CRDP Parameter Descriptions
6.5 Data Link Status Information
APPENDIX A CG POINT PREPARATION
A.1 CG Point Building Overview
A.2 Custom Data Segment Construction
A.2.1 Custom Data Segment Heading
A.2.2 Custom Data Segment Parameters
A.2.3 Custom Data Segment Example
A.2.4 Custom Data Segment Compilation Recommendation
A.3 ACIDP/CRDP Point Building
A.3.1 ACIDP Scheduling Recommendations
APPENDIX B HARDWARE INSTALLATION/CHECKOUT/SERVICE
B.1 CG Installation, Service and Testing
B.1.1 CG Installation
B.1.2 CG Service
B.1.3 CG Testing
B.2 Cables and Connectors
B.2.1 RS-449 CLI Adapter Board Connections
B.2.2 RS-449 Standard (Modem Connection) Cable
B.2.3 RS-449 Direct Connect Cable
B.2.4 RS-449 Loopback Cable
B.2.5 RS-449 Loopback Connector
B.2.6 RS-232C CLI Adapter Board Connections
B.2.7 RS-232C Standard (Modem Connection) Cable
B.2.8 RS-232C Direct Connect Cable (Type I)
B.2.9 RS-232C Direct Connect Cable (Type II)
B.2.10 RS-232C Loopback Cable
B.2.11 RS-232C Loopback Connector
APPENDIX C TIMING DATA AND PERFORMANCE CONSIDERATIONS
C.1 CG Processing Restrictions
C.2 CG Performance Limits
C.3 Input Data Precollection
APPENDIX D ASSIGNMENT OF PROCESS UNITS TO CG