Manual Chapter 5

5-41
Machine Moves
Machine Moves
After defining the job, checking the foot pre-check, collecting alignment
data, and viewing the analysis of the alignment data, you are ready to see
what machine moves are required. This section shows the screens and
information that are available.
While in the Machine Moves section, in addition to viewing the required
corrections, you can watch them being made in live mode (and view six dif-
ferent solutions in each plane – horizontal and vertical). Within the vertical
and horizontal logs, you can see how the present alignment condition com-
pares to the tolerances goal you are shooting for.
Use the Enter key to first view the Vertical Move, and then the Horizontal
Move. A bullseye on each of the move screens displays the corresponding
tolerances. The alignment readings and machine moves will be automati-
cally recorded when the Enter key is pressed to exit from the Horizontal
Move screen.
When the readings and moves are recorded, a screen listing the number of
readings recorded for the current alignment job (maximum of 20) will
appear for a few seconds. The number of readings recorded will also be dis-
played in the lower right of the Main menu screen.
Note
The alignment readings must be different from the previous set
for the current set of readings to be recorded.