Date Received:
December 4, 2012
Submittal Number:
238126
Project Name:
Northwestern Mutual-West Denver
Office Building
Project Number:
12J2000
Client/Construction Manager:
Barker Rinker Seacat & Partners
Submitting Contractor:
GHPhipps
Description:
Split System Air Conditioners
A – No Exceptions Taken B – Make Correction(s) as Noted, No Resubmittal Required
C – Rejected D – Revise and Resubmit E – Submit Specified Item
ITEM
(e.g. spec #
or dwg #)
REFERENCE
(e.g. page # or paragraph)
COMMENTS
A
CTION
(legend above)
238126
Split System Air
Conditioners
FCU-1/ACCU-1
Carrier
No comment.
A
238126
Split System Air
Conditioners
FCU-2 Multi-aqua/
A
CCU-2
Compu-Aire, Inc.
No comment.
A
3025 S. Parker Rd | Suite 1100 | Aurora | CO | 80014
(303)696-2602 | www.ssgroupinc.com
SSG MEP, Inc.
REVIEWED
FURNISH WITH CHANGES NOTED
REJECTED RESUBMIT SPECIFIC ITEM(S)
REVISE & RESUBMIT
TRANSMITTED WITH NO REVIEW MADE
A
ctions taken by SSG MEP, Inc. with respect to the Submittal are only for general
conformance with the design concepts of the Project based upon the Contract
Documents. In all respects, SSG MEP, Inc. is subject to the terms and conditions of its
contract with its Client. Notations, “corrections” or comments on the Submittal(s) do
not modify the obligations of the contractor or its subcontractors from those set forth in
the Contract Documents. Contractor shall field verify, confirm, correlate all dimensions,
sizes and tolerances before construction or installation of any component or assembly
begins. Unless otherwise specifically noted on the submittal, all fabrication, installation and
construction means, methods, techniques, sequences, schedules and procedures remain
solely the responsibility of the contractor. Contractor remains solely responsible for job
site safety and all safety precautions and procedures. Notwithstanding anything else to the
contrary, SSG MEP, Inc. by reviewing this Submittal does not assume professional
responsibility for any design or work product (including but not limited to its technical
accuracy or professional competency) provided by contractor or owner on a “design
build” or “performance specification” basis. SSG MEP, Inc. provides no warranties,
ex
p
ressed or im
p
lied.
Reviewed By:
A
EI
SSG MEP, Inc. Project Number:
10054.00
Date:
December 17, 2012