Operating instructions

10
Compool Cp3810
Equipment Power
The diagram above shows how the filter pump is wired. Additional pumps should be wired the
same way.
To wire high voltage equipment
1. At the Sub-panel, install circuit breaker. Run wires from circuit breaker to relay terminal
block LINE 1 and LINE 2.
2. Connect equipment to the relay terminal block LOAD 1 and LOAD 2.
Note
If pump is greater than 3 H.P., install an external contactor. Use relay to switch coil of
external contactor.
Adding Relays
The Power Center comes standard with 4 relays. It is possible to add additional relays (model
RLY-LX). The LX-3810 Power Center has room for 7 relays, and the LX-3810L Power Center
has room for 8 relays.
LINE 1
LINE 2
LOAD 1
LOAD 2
R1
LINE 1
LINE 2
LOAD 1
LOAD 2
R2
LINE 1
LINE 2
LOAD 1
LOAD 2
R3
LINE 1
LINE 2
LOAD 1
LOAD 2
R4
LINE 1
LINE 2
LOAD 1
LOAD 2
R5
LINE 1
LINE 2
LOAD 1
LOAD 2
R6
LINE 1
LINE 2
LOAD 1
LOAD 2
R7
HIGH VOLTAGE RELAYS
FULL LOAD: 20AMP
LOCKED ROTOR: 60AMP
Lx3810
SUB-PANEL
Filter
Pump
Heater
6
5
4
3
2
1
P
Solar
Auto
Service
IMPORTANT: Switch back to
Auto after servicing equipment.
Water Sensor
Solar Sensor
Sensor
Status
Auto
Auto
Service
Press Filter key 2 times quickly.
Filter Pump On:
Press
Filter key 3 times quickly.
Filter Pump Off:
To cancel:
The 3-hour override can be
cancelled by switching to
Service, and then back to Auto.
Make sure the Auto/Service
key is in the Auto position.
Override Verification:
The Auto lamp will blink
during the 3-Hour Override.
Instructions:
When adding chemicals, the filter
pump can be set to stay on for three
hours -or- stay off for three hours.
This overrides the programming of
the Cp3810 indoor controller on a
one-time basis. The same procedure
can be used on the other equipment
keys 1-6.
3 Hour Filter Override
P
P
B
Freeze Sensor
Lamp ON indicates problem with the
sensor or wires leading to sensor.
Check connections and replace sensor
if necessary.
B.wash