Service manual

Ultraview 1030/1050 Monitors — Service Manual
4-24
Removing the CO
2
PCBAs for Option H
Figure 4-18: CO
2
/SDLC PCBA and sensor interface PCBA for option H
1 Remove the four 6-32 × 1/4 inch screws and lift out both PCBAs.
2 Remove the 4-40 × 1/4 inch metal screw and the three 4-40 × 1/4 inch plastic screws over the
standoffs and separate the sensor interface PCBA from the CO
2
/SDLC PCBA.