Operating instructions
19
E. Powering-On the Array
E. Powering-On the Array
1. Press in the power/standby switch 
with the retracted tip of a pen or 
pencil to power-on the array (see 
Fig. 42). Allow 2 minutes for the 
disk drives and controllers to 
complete their self-tests.
NOTE: Disk drives are not visible on 
the bus until they have completed 
their self-tests.
2. Verify that the system activity LED 
is ON and the disk drive activity 
LEDs are ON (both green).
Fig. 42. Powering-on the array
NOTE: If a terminal emulator or RS-
232 terminal is connected to the RS-
232 port on either controller, the 
virtual front panel will display the 
initialization sequence during 
power-on.
CAUTION! If any amber LEDs are 
ON, or if you hear a series of beeps, 
refer to the VA 7100 User’s Guide, part 
no. A6183-90900, to begin trouble-
shooting steps.
System Activity LED (Green)
Disk Fault LED (Amber)
Disk Activity LED (Green)
System Fault LED (Amber)










