Technical data
Installing and Configuring the FC 6164 29
to lift and position the switch onto the lift. Two or more people are also
required to move the switch from the lift into the rack and when
positioning the switch in the rack. Move the switch chassis slowly and
carefully at all times, and continue supporting it until it is correctly
positioned on the rail tray and fastened to the rack. Use extreme caution
when handling or transporting the switch to prevent injury to personnel,
damage to the switch, and/or damage to the rack and other equipment
mounted in it.
Package Contents
Figure 3 shows the major items contained in the FC 6164 shipping
carton(s). Table 7 lists the contents of the shipping carton.
Figure 3. Major Items Contained in the Shipping Carton(s)
A
C
B
G
D
F
F
E










