User guide
Index 7
front panel LEDs 3-2
GBIC Installed LEDs on the
Storage Hub 12 4-6
GBIC Installed LEDs on the
Storage Hub 7 4-5
hard drive LEDs 3-5
inserting the drive 2-12, 4-24
installing the Fan
Assembly 4-21
installing the power
supply 4-19
installing the RA4000
Controller 4-11, 4-13
latching the drive into
place 2-12, 4-24
Power and Fault LEDs on the
Storage Hub 12 4-6
power supply LED 4-9
power supply LEDs 3-3
RA4000 Controller LEDs 4-3
removing the Fan
Assembly 4-20
removing the power
supply 4-18
removing the RA4000
Controller 4-10, 4-13
simple point-to point Fibre
Channel connection D-3
structure of data transmission
over Fibre Channel
cable D-7
firmware
drive failure F-1
updating D-4
frames See also data, transmitting
fields D-6
G
GBICs D-4
cables supported 1-1
FC-AL D-6
installing 2-3, 2-13, 2-14, 4-5,
4-6
kit contents 1-1
Longwave 1-1, 2-2, 2-15
removing 4-10, 4-11
replacing 4-11, 4-13
Shortwave 1-1, 2-2, 2-16
getting help xii
Gigabit Interface Converters See
GBICs
grounded outlets 2-3, 2-6, 2-19
grounding methods B-2
grouping physical drives 5-7
H
hard drive
LED 3-5
hard drives
adding 1-8
choosing bays 2-12
configuring 3-1
defining arrays 1-7
detecting F-4
ejector levers 2-12, 4-24, 4-25
failure E-9, F-1, 1-7
effect on performance E-7, E-8
multiple E-9, F-1
replacing F-3
heights supported 1-6
hot-pluggable E-16, 1-5, 2-1
identifying 3-1
inserting 2-12, 4-25
installing 2-2, 2-12
latches 2-12, 4-24, 4-25
LEDs 4-1
amber 4-2
location 1-6
online spare 1-8
performance 1-10
rebuilding E-16
recognizing 2-12, 4-25
reconstructing 2-12, 4-25
removing 4-24
removing in fault-tolerant
systems 4-21
replacement 1-5
replacing
automatically E-10
capacity E-16, F-3