User guide

Options ROMPaq 6-3
12. If you are finished reprogramming options, press Esc to exit the
ROMPaq Utility.
13. Remove the Options ROMPaq diskette and reboot the server by cycling
the power (cold boot). To upgrade additional options in the server,
repeat steps 1 through 10 by booting from each Options ROMPaq
diskette in succession.
NOTE: If your configuration includes a redundant power supply, you must cycle both
power supplies simultaneously.
The RA4000 Controller ROM has been updated and you can take advantage of
any new or increased capabilities available with the new firmware.