Installation guide
Cabling Guidelines 4-9
For use with 1-GHz or greater Intel Pentium III processor-based server models only
Compaq Confidential – Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Setup and Installation Guide Comments:
Part Number: 201345-001 File Name: e-ch4 Cabling Guidelines.doc Last Saved On: 7/11/00 9:08 AM
3. Remove the SCSI cable from the SCSI channel A connector on the
system board.
4. Reconnect the SCSI cable to either the SCSI Controller option or Smart
Array Controller.
Figure 4-8. Connecting a SCSI cable to a SCSI controller option or Smart
Array Controller
NOTE: Both SCSI channels on the Server Feature Board are self-terminating. If you
choose to not use one or both of the SCSI channels, you do not need to terminate the
unused channel(s).










