Installation guide

Overview of Server Installation 2-3
For use with 1-GHz or greater Intel Pentium III processor-based server models only
Compaq Confidential – Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Setup and Installation Guide Comments:
Part Number: 201345-001 File Name: c-ch2 Overview of Server Installation.doc Last Saved On: 7/11/00 9:03 AM
Locating Materials
Locate the following materials that were shipped with your ProLiant ML350:
Keyboard
Mouse
Power cord
Documentation label inside the server (most of the option installation
and setup instructions are located on the label, which is attached to the
inside of the access panel)
Documentation and software packs inside the shipping box: Server
Setup and Management, Reference Information, and Software Products
In addition to these supplied items, you may need:
Torx T-15 screwdriver
Options to be installed, such as expansion boards, monitors, uninterruptible
power supply (UPS), or memory
Application software