User guide

Hardware options installation 66
7.
Align the baffle guide posts with the holes on the fan and the system board.
8. Install the large air baffle.
9. Install the access panel (on page 28).
10. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
11. Power up the server (on page 25).
Redundant hot-plug power supply option
The server supports a second hot-plug power supply to provide redundant power to the system if the
primary power supply fails.