Specifications
Rack Installation 2-17
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: c-ch2 Installing.doc Last Saved On: 6/19/01 8:36 AM
Cabling the Server
After the cable management arm is installed, cable the server by following
these procedures:
1. Plug all external cables into the server.
2. If you installed a switchbox into the rack, route the CPU-to-switchbox
cables to the switchbox.
3. Bundle all of the cables, including the power cable, and then secure
them to the cable management arm using the tiewraps (supplied).
Figure 2-11. Routing and securing the cables
4. Extend the bundled cables down the rack cable channel.










