Specifications

Rack Installation 2-7
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: c-ch2 Installing.doc Last Saved On: 6/19/01 8:36 AM
Marking with the Template
A template is provided to mark the rack for cage nut and mounting bracket
positions. Starting at the bottom of the rack or at the top of a previously
mounted component:
1. With the two push tabs, place the template in the desired location. Make
sure that you match the hole pattern printed on the template with the
actual holes on the rack vertical rails.
Template
Template
Figure 2-1. Using the template
2. Use a pencil to mark locations indicated on the template for cage nuts
and mounting brackets.
3. After marking the front of the rack, flip the template over, and then
repeat the procedure on the back rails of the rack. Also mark the top of
the template on the rack to help align the next components.