Specifications

1-14 Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/10/01 1:05 PM
Installing the Cable Management Arm Bracket
The cable management arm bracket allows you to secure the cable
management arm to the server and to the rear frame of the rack.
To install the cable management arm bracket:
1. Locate the two bracket screws (Part Number 192308-002) included with
your kit.
2. Using a Torx T-15 screwdriver and the two bracket screws, secure the
cable management arm bracket to the back of the server, as illustrated in
Figure 1-12.
Figure 1-12. Securing the cable management arm bracket to the server
NOTE: The rear of the server may look different depending on the model purchased.
When you have completed the procedures in this chapter, proceed to
Chapter 2, Rack Installation.