Specifications
Preparing the Server 1-13
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/10/01 1:05 PM
To install the component rails onto the server:
1. Place the tab of one component rail at the front of the server chassis.
The holes in the component rail line up only one way with the chassis.
2. Secure the flat side of the component rail to each side of the server
chassis with three 8-32 x 1/4-inch Phillips screws (supplied). Do not use
washers or other screws.
3. Repeat this procedure on the other side of the server using the second
component rail.
Figure 1-11. Installing a component rail on the server










