Specifications
Preparing the Server 1-11
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/10/01 1:05 PM
Installing the Rack-Mount Front Panel
To install the rack-mount front panel:
1. Align the pins on the front panel with the corresponding slots on the
chassis.
Figure 1-8. Installing the rack-mount front panel
2. Secure the front panel to the chassis by tightening the thumbscrews.
Figure 1-9. Securing the rack-mount front panel
3. Reinstall the access panel, and then tighten the thumbscrews.










