Specifications

Preparing the Server 1-3
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/10/01 1:05 PM
Table 1-1
Conversion Kit Contents
Item Description Item Description
Bar nut
Screws and cage nuts (6 bags)
Cable management arm
mounting bracket
Slide rail assemblies
Cable management arm bracket
Rail mounting brackets
Template
Tiewraps
Rack-mount front panel Cable management arm
Documentation
Powering Down the Server
To power down the server:
1. Schedule downtime for the server upgrade.
2. Perform a system backup of your server according to your operating
system requirements.
3. Power down your server according to your network operating system
requirements.
4. Power down the server, and then power down all peripheral devices.
CAUTION: Never power down a storage system unless the server controlling it
has been powered down first. Powering down the storage system first causes
the controller to mark the drives as failed.
5. Disconnect the AC power cord from the AC outlet, and then from the
server.
6. Label and disconnect all cables connected to the back of the server.