Specifications

Upgrading the Subsystem 3–15
4. Enter option 2. The following menu appears:
Install Options:
1. Other controller and cache module
2. Other controller module
3. Other cache module
4. Exit
Enter choice: 1, 2, 3, or 4 ->
5. Enter option 1. The following display appears:
Insert both the slot A [or B} controller and cache module? Y/N
6. Enter Y(es). The following display appears:
Quiescing all device ports. Please wait...
Device Port 1 quiesced.
Device Port 2 quiesced.
Device Port 3 quiesced.
Device Port 4 quiesced.
Device Port 5 quiesced.
Device Port 6 quiesced.
All device ports quiesced.
.
.
.
Perform the following steps:
1. Turn off the battery for the new cache module by pressing
the battery’s shut off button for five seconds.
2. Connect the battery to the new cache module.
3. Insert the new cache module in slot B within 4 minutes.
NOTE: A countdown timer allows a total of four minutes to install the controller and cache
module. After four minutes, “this controller” will exit FRUTIL and resume operations. If this
happens, return to step 2 and proceed.
CAUTION: ESD can easily damage a cache module or controller. Wear a snug-fitting,
grounded ESD wrist strap.
7. Insert the new ECB into an empty bay or on top of the enclosure.