Specifications
3–14 Compaq StorageWorks HSG80 Array Controller ACS Version 8.5 Maintenance and Service Guide
Upgrading to a Dual-Redundant Controller
Configuration
Use the following steps to upgrade a single-controller configuration subsystem to a
dual-redundant configuration subsystem. To replace failed components, see Chapter 2 for
more information. Before beginning this procedure, obtain the following items:
■ A second controller with the same software version and patch level as installed in the
current single-controller
■ A second cache module with the same memory configuration as installed in the current
cache module
■ A second ECB
■ A second ECB Y-cable
Use the following steps to install a second controller, cache module and ECB:
CAUTION: After installing the EMU, check the PVA SCSI ID number on the master
enclosure to make sure it represents the correct enclosure number (ID 0). If the SCSI
ID number is not 0, reset it to ID 0 before starting the controller.
1. Connect a PC or terminal to the maintenance port of the operational controller.
The controller connected to becomes “this controller;” the controller being added
becomes the “other controller.”
2. Start FRUTIL with the following command:
RUN FRUTIL
The following display appears:
Do you intend to replace this controller’s cache battery? Y/N
3. Enter N(o). The following menu appears:
FRUTIL Main Menu:
1. Replace or remove a controller or cache module
2. Install a controller or cache module
3. Replace a PVA module
4. Replace an I/O module
5. Exit
Enter choice: 1, 2, 3, 4, or 5 ->