Specifications

Replacement Procedures 2–23
10. Enter Y(es). The following display appears:
Quiescing all device ports. Please wait...
Device Port 1 quiesced.
Device Port 2 quiesced.
Device Port 3 quiesced.
Device Port 4 quiesced.
Device Port 5 quiesced.
Device Port 6 quiesced.
All device ports quiesced.
.
.
.
Perform the following steps:
1. Turn off the battery for the new cache module by pressing
the battery’s shut off button for five seconds
2. Connect the battery to the new cache module.
3. Insert the new cache module in slot A [
or B
] within 4
minutes.
NOTE: A countdown timer allows a total of four minutes to install both the cache module and
controller. After four minutes, “this controller” will exit FRUTIL and resume operations. If this
happens, return to step 6 and proceed.
CAUTION: The ECB must be disabled—the status light is not lit and is not
blinkingbefore disconnecting the ECB cable from the cache module. Failure to
disable the ECB might result in cache module damage.
Carefully align the cache module and controller in the appropriate guide rails.
Misalignment might damage the backplane.
11. Disable the ECB by pressing the battery disable switch until the status light stops
blinking—approximately five seconds.
12. Connect the ECB cable to the new cache module.
13. Insert the new cache module into its bay and engage its retaining levers. The following
display appears:
Insert the controller module, WITH its program card, in slot A [
or B
]
within x minutes, xx seconds.