Specifications

Replacement Procedures 2–19
The following display appears:
Do you intend to replace this controller’s cache battery? Y/N
5. Enter N(o). The following menu appears:
FRUTIL Main Menu:
1. Replace or remove a controller or cache module
2. Install a controller or cache module
3. Replace a PVA module
4. Replace an I/O module
5. Exit
Enter choice: 1, 2, 3, 4, or 5 ->
6. Enter option 1. The following menu appears:
Replace or remove Options:
1. Other controller and cache module
2. Other controller module
3. Other cache module
4. Exit
Enter choice: 1, 2, 3, or 4 ->
7. Enter option 1. The following display appears:
Slot Designations
(front view)
[ --- EMU --- ][ --- PVA --- ]
[ -------- Controller A ------- ]
[ -------- Controller B ------- ]
[ Cache Module A ][ Cache Module B ]
Remove both the slot A [
or B
] controller and cache module? Y/N