Specifications

Replacement Procedures 2–9
Figure 2–5. ECB battery disable switch location
NOTE: To return to normal operation, apply power to the storage subsystem. The ECB will be
enabled when the subsystem is powered on.
Restarting the Subsystem
Use the following steps to restart a subsystem.
1. Refer to enclosure documentation for specific procedures to follow for restarting the
subsystem.
Once power is applied to the subsystem, the controllers automatically restart and the
ECBs are automatically β€œre-enable” to provide backup power to the cache modules.
2. Mount the logical units on the host. If using a Windows NT platform, restart the server.
ECB 1
ECB 2
Power connector
Status LED
Battery disable
switch (SHUT OFF)
CXO6164C
4
5
2
3
1