Service manual
4-34 AlphaServer GS80/160/320 Service Manual
4.5.6 Global Port Module Removal and Replacement
The global port is the module closest to the distribution board or to the
H-switch in systems with more than one system box. The pins on the
cables are very fragile.
Figure 4– 11 Global Port Removal
2
PK2242
1
Module Removal
1. If the system is not partitioned, shut down the operating system and issue the SRM
power off command. Put the OCP switch in the Off position. Skip step 2.
2. If the system is partitioned, from the console connected to the partition with the
target FRU, shut down the operating system and power it off using the SRM power
off command. Put the PSM(s)’ switch in the Service position. Note, only hard
partitions can be powered off. If soft partitions are used, they must be shut down
and the hard partition must be powered off from the console controlling the
partition.
3. Access the QBB that contains the target FRU. See Section 4.5, Figure 4–5.